Grab the exclusive opportunity of owning a shop at Supertech Limited’s Supertech Mart.
Supertech Limited brings forth a premium shopping arena – Supertech Mart, exclusively developed for the convenience of the people of Gurgaon, Gurugram. As a part of Supertech’s mega township – Supertech Aadri, the commercial complex is spread over more than 800 sq. ft. area with shops spanning across three floors – Lower Ground, Ground, and First Floor. An excellent investment option, the complex houses shops of various sizes ranging from 346 sq. ft. to 800 sq. ft. Nestled on a 24-meter wide road, Supertech Mart is surrounded by an array of residential projects that assure great footfall all around the year.
An amazing investment option for those who wish to expand their horizons, book your shops in Gurgaon exclusively.
Basic Sales Price(per sq. ft.) For Ground Floor | ||||
Floor | CLP | PLP | ASSU.Returns | |
BSP | 10000 | 10500 | 11500 | |
Basic Sales Price(per sq. ft.) For Lower Ground Floor | ||||
Floor | CLP | PLP | ASSU.Returns | |
BSP | 9000 | 9500 | 10500 | |
Basic Sales Price(per sq. ft.) For First Floor | ||||
Floor | CLP | PLP | ASSU.Returns | |
BSP | 8000 | 8500 | 9500 | |
One Time Charges | ||||
IFMS | RS 100/ | |||
EDC/IDC | As applicable | |||
Electricity Installation Charges(min 2kw) | Rs 20,000/kw | |||
Power Back Up | Rs 20,000/kw | |||
PLC’s | ||||
Corner | 5% of BSP | |||
Note: (i) 2kw electric installation is mandatory. (ii)1 KW power back up is mandatory |
Possession Linked Payment Plan | |
On Booking | 5 Lacs |
Within 30 Days of Allotment | 10% of BSP Less booking Amount |
Within 90 days of Allotment | 20% of BSP |
On Completion of Superstructure | 30% of BSP + 50% Addl. Charges |
On Offer of Possession | 40% of BSP + 50% Addl. Charges |
Time Linked Payment Plan | |
On Booking | 5 lacs |
Within 45 days of Booking | 20% less 5 lacs |
On Start of Excavation | 12.5% of BSP |
Within 6 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 12 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 18 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 24 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 30 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 30 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 36 months after Excavation | 12.5% of BSP + 25%(EDC/IDC) |
On Offer of Possession | 5% + Other Charges(if any) |