DLF The Crest at DLF Phase 5, a premium residential community in Sector 54 Gurgaon, offers you a choice of exclusive homes and lifestyle amenities. This residential project gives you spacious and airy apartments, outstanding construction quality and a range of recreational activities and facilities in the heart of Gurgaon.
DLF The Crest Gurgaon is a premium project situated in Sector 54 and developed by the renowned DLF Group. The construction status of this excellent project is ongoing and it encompasses 482 well-ventilated units spread across 6 thoughtfully designed towers. The price of these amazing units ranges from Rs. 3.60 Crore to Rs. 11.30 Crore, which is within the budget of many home-buyers.
Specifications & Amenities | |
|
|
Living/ Dining/ Lobby/ Passage | |
Floor | Imported marble/ stone/ tiles |
Walls | Acrylic emulsion paint finish. |
Ceiling | Acrylic emulsion paint with false ceiling. (extent as per design) |
Bedrooms | |
Floor | Laminated wooden flooring. |
Walls | Acrylic emulsion paint finish. |
Ceiling | Acrylic emulsion paint with false ceiling. (extent as per design) |
Modular Wardrobes | Modular wardrobes of standard make in all bedrooms except utility room. |
Kitchen | |
Floor | Anti-skid tiles. |
Walls | Tiles up to 2′-0″ above counter and acrylic emulsion paint in the balance areas. |
Ceiling | Acrylic emulsion paint with false ceiling (extent as per design). |
Counter | Marble/ granite/ synthetic stone. |
Fittings & Fixtures | CP fittings, Double bowl sink with single drain board, exhaust fan. |
Kitchen Appliances | Fully equipped modular kitchen with hob, chimney, oven, microwave, dishwasher, refrigerator and washing machine of a standard make. |
Master Toilet | |
Floor | Marble/ granite/ synthetic stone/ anti-skid tiles. |
Walls | Marble/ tiles/ acrylic emulsion paint & mirror. |
Ceiling | Acrylic emulsion paint on false ceiling. |
Counters | Marble/ Granite/ Synthetic StoneMarble/ granite/ synthetic stone. |
Fittings & Fixtures | Shower partitions/ vanities/ exhaust fan/ towel rail/ ring/ toilet paper holder/ robe hook of standard make. |
Sanitary ware/ CP fittings | Single lever CP fittings, health faucet, wash basin & EWC of standard make. |
Common Toilets | |
Floor | Anti-skid tiles. |
Walls | Tiles/ acrylic emulsion paint and mirror. |
Ceiling | Acrylic emulsion paint on false ceiling. |
Counters | Marble/ granite/ synthetic stone. |
Fittings & Fixtures | Shower partitions/ vanities/ exhaust fan/ towel rail/ ring/ toilet paper holder/ robe hook of standard make. |
Sanitary ware/ CP fittings | Single lever CP fittings, health faucet, wash basin & EWC of standard make. |
Utility Room | |
Floor | Tiles. |
Walls & Ceiling | Oil bound distemper. |
Toilets | Anti-skid tile flooring and combination of oil bound distemper and limited tiled walls, with conventional CP fittings & sanitary ware. |
Other | Air conditioning in the utility room. |
Air Conditioning Loads | |
Proposed 8 HP to 14 HP for all types of typical apartments & 16 HP to 24 HP for the pent-houses (depending upon the size and the type of the apartment). |
|
Security System | |
Secured gated community with access control at entrances and CCTV for parking area and entrance lobby at ground floor and basements | |
Lift Lobby | |
Lift Lobby Walls | Granite/ stone/ tiles/ Acrylic emulsion/ wall paper/ textured paint finish. |
Lift Lobby Floor | Granite/ stone/ tiles. |
Lift Lobby Ceiling | Acrylic emulsion paint finish. |
Fire Fighting System | |
Synchronized fire fighting system with sprinklers, smoke and heat detection system as per norms. | |
Community Recreational Facilities | |
|
|
Balconies | |
Floor | Tiles/ Stone. |
Walls & Celing | Exterior Paint. |
Doors | |
Main Apartment doors | Polished veneer flush door/ solid core moulded skin door. |
Internal doors including Utility room door: | Painted flush door/ moulded skin door. |
External Glazing | |
Windows/ External Glazing | Energy efficient, double glass units with tinted/ reflective or clear glass with aluminum/ UPVC frames in habitable rooms and aluminum/ UPVC frames with single pinhead/ tinted/ clear glass in all toilets and utility rooms. |
Electrical Fixtures & Fittings | |
Modular switches of Legrand/ Crabtree/ Norsys or equivalent make, all internal wirings (complete) and ceiling light fixtures in balconies. | |
Power back-up | |
Blocks – A, B, C | Proposed 13KW to 24KW (depending upon the size & the type of apartment). |
Blocks – D, E, F | Proposed 11 KW to 18 KW (depending upon the size & the type of apartment). |
DLF The Crest experience of tasteful sophistication starts even before you reach the gates of the property. As you approach DLF The Crest, a tree-lined road, Park Drive, welcomes you. Entry to this exclusive area is restricted and monitored closely yet unobtrusively by a trained security team.
Experience a neighborhood with so much to offer. Strategically located at DLF Phase 5, Sector 54 Gurgaon, life here offers superb connectivity to Delhi, Faridabad, and major commercial hubs. DLF V in Gurgaon is truly a setting crafted with living large in mind, and residential communities like The Crest makes it more exclusive and desirable.
Price List | |
Unit Type | Basic Sale Price |
Apartments | Rs. 19,500/- Per Sq. Ft |
Penthouse | Rs. 20,500/- Per Sq.Ft |
|
Other Charges | |
Charges for exclusive right to use the Parking Space(s) | Rs. 7.5 Lacs Per Parking Space |
|
|
Interest Bearing Maintenance Security (IBMS) | Rs. 250 Per Sq.Ft. |
Booking Amount | ||||
Apartments | Rs. 26,12,500/- in favour of DLF Limited | |||
Penthouses | Rs. 52,25,000/- in favour of DLF Limited | |||
Preferential Location Charges (PLC) | ||||
Block | PLC | |||
Block D – Unit 1 & 4 | 10% | |||
Block D – Unit 2 | 17.5% | |||
Block D – Unit 3 | 22.5% | |||
Block B – Unit 1 & 4 | 10% | |||
Block B – Unit 2 & 3 | 17.5% | |||
One attribute | 10% | |||
Two attributes | 17.5% | |||
Three attributes | 22.5% | |||
Four or more attributes | 25% | |||
Payment Plan | ||||
Possession Linked Payment Plan | ||||
On Application for Booking | Rs. 25 Lacs + Service Tax | |||
Within 2 months of Booking | 11% of Sale Value (less booking amount) | |||
Within 4 months of Booking | 11% of Sale Value | |||
Within 6 months of Booking | 11% of Sale Value | |||
On Casting of Terrace floor slab of the tower | 33% of Sale Value | |||
On Application of OC | 34% of Sale Value | |||
On offer of Possession | Balance payments on account of Escalation Charges, Taxes, IBMS, Stamp Duty & Registration Charges + Any other balance payment, if any due | |||
Subvention Plan | ||||
On Application for Booking | Rs. 25 Lacs + Service tax (By Customer) | |||
Within 3 Months of Booking | 15% of Sale Value (less booking amount) (By Customer) | |||
On start of excavation | 20% of Sale Value (By Bank) | |||
Within 2 months from the start of excavation | 5% of Sale Value (By Bank) | |||
On start of foundation | 5% of Sale Value (By Bank) | |||
Within 2 months of start of foundation | 5% of Sale Value (By Bank) | |||
On Completion of laying of Basement Roof | 5% of Sale Value (By Bank) | |||
Within 2 months of laying of Basement Roof | 5% of Sale Value (By Bank) | |||
On Casting of 6th floor slab | 5% of Sale Value (By Bank) | |||
Wihtin 2 months of casting of 6th floor slab | 5% of Sale Value (By Bank) | |||
On casting of 16th floor slab | 5% of Sale Value (By Bank) | |||
Within 2 months of casting of 16th floor slab | 5% of Sale Value (By Bank) | |||
On casting of 24th floor slab | 5% of Sale Value (By Bank) | |||
Within 2 months of casting of 24th floor slab | 2.5% of Sale Value (By Bank) | |||
On Casting of Terrace floor slab of the tower | 2.5% of Sale Value (By Bank) | |||
On Application of Occupation Certificate | 5% of Sale Value (By Customer) | |||
On offer of Possession | 5% of Sale Value + Balance payments on account of Escalation Charges , Taxes , IBMS , Stamp Duty & Registration Charges + Any other balance payment, if any due (By Customer) | |||
Down Payment Plan | ||||
On Application for Booking | 25 lacs + Service Tax | |||
Within 2 Months of Booking | 10.0% | |||
Within 6 Months of Booking | 90.0% | |||
Less TPR (1500 PSF) | ||||
Less DP | 12.0% | |||
90% Payment | ||||
Construction Linked Payment Plan | ||||
On Application for Booking | 25 lacs + Service Tax | |||
Within 45 Days of Booking | 10% of Total Price (including Booking Amount) | |||
Within 3 months of Booking | 10% of Total Price | |||
Within 6 months of Booking | 10% of Total Price | |||
On starting of excavation | 5% of Total Price | |||
Within 2 months of starting of excavation | 5% of Total Price | |||
On start of foundation | 5% of Total Price | |||
Within 2 months of start of foundation | 5% of Total Price | |||
On completion of laying of Basement Roof (under the Tower) | 5% of Total Price | |||
Within 2 months of laying of Basement Roof (under the Tower) | 5% of Total Price | |||
On casting of 6th floor slab | 5% of Total Price | |||
Within 2 months of casting of 6th floor Slab | 5% of Total Price | |||
On casting of 16th floor slab | 5% of Total Price | |||
Within 2 months of casting of 16th floor slab | 5% of Total Price | |||
On casting of 24th floor slab | 5% of Total Price | |||
Within 2 months of casting of 24th floor slab | 5% of Total Price | |||
On casting of terrace floor slab | 5% of Total Price | |||
On application for Occupation Certificate | 5% of Total Price | |||
On offer of Possession | Balance payments on account of Escalation Charges, Taxes & Cesses, IBMS, Stamp Duty & Registration Charges + Any other balance payment, if any due | |||
Note:-
|