Supertech 76 canvas, another masterpiece is ready for launch. After the success of Supertech hues bookings in sector 68, Supertech is launching 76 canvas 2 bhk bare shell apartments. For those who have a dream of buying a home in Gurgaon or those who want to invest in Gurgaon with a trusted builder brand. Supertech 76 canvas bare shell apartments in Gurgaon Gurugram are the best option, where not only one gets the best location but also at the best price too. Supertech 76 canvas is a great investment in Golf Course Ext. Road Invest in 2 BHK, Most Developing Vicinity & Just 25-minute drive from Delhi & IGI. Supertech hues project is enviably located on the Golf Course Ext. Road, Sector- 68, Gurgaon surrounded by very high profile residential, business hub, High Rise Condominiums, and Corporate Towers.
Structure
– Earthquake-resistant RCC framed structure with external brick/block walls.
Wall-Finish
Internal: Internal walls in cement plaster with POP punning with plastic emulsion paint or texture finish.
External: Combination of stone, tiles, Acrylic emulsion/Texture Paint.
Flooring/wall Dado
Drawing Room, Living, Dining: Italian/Spanish vitrified tiles or equivalent quality with designer patterns.
Bedrooms: Vitrified tiles/High-quality wooden laminate flooring.
Study room
– Vitrified tiles/High-quality wooden laminate flooring.
Balcony
– High-quality anti-skid ceramic tiles.
Servant Room/study: Kitchen counter with high-quality granite/imported marble, floor and wall dado with high-quality ceramic tiles.
Toilets
– Imported beige Spanish tiles or equivalent flooring. Spanish tiles in walls till ceiling height for the master toilet. All other toilets will have the high-quality imported ceramic floor and wall tiles up to 7 ft. height, balance painted in acrylic emulsion paint.
Kitchen
– Imported fittings of Kohler or equivalent. Double bowl stainless steel sink with drainboard. Designer/modular woodwork & fittings.
– Provisions for piped gas supply & R.O. system.
Doors & Windows
Main Entrance: Elegantly designed and finished 8 feet high entrance door with polished hardwood frame having European style molded shutter with high quality imported/Indian hardware fittings.
Electrical Fitting: Seasoned hardwood frame with European-style molded shutters.
Walls: Branded UPVC windows.
Toilets
– Premium quality imported sanitary/high-class wall hung W.C. and washbasin in matching shades/colors. Single lever C.P. Fittings Kohler/Jaquar or equivalent. All the toilets will include an exhaust fan, mirror, towel rack, rod & ring accessories. The master toilet will have a glazed shower enclosure.
Others
– Branded split air conditioners in the master bedroom and living room. Modular wardrobes/cupboards in all the bedrooms.
Electricals
– Modular range switches/ sockets (Legrand or equivalent)/MCBs, copper wiring. Two wall light fixtures in each of living, dining, lobby, and bedrooms area.
Power backup
– 100% power back-up for every apartment.
Communication
– TV and telephone points, EPABX, and video door phone.
Security
– Secured gated community with access control at entrances with Automatic boom barriers and manual gates at entry and exits of the development. CCTV in basements, ground floor lobbies, and main entrance lobby for surveillance. EPABX system linked to each unit.
– Access control cards and video door phones for each apartment.
[A] Basic Sales Price
Basic Price per sq.ft. | PLP Price per sq.ft. | Subvention Plan Price per sq.ft. |
Rs. 6,000 | Rs. 5,900 | Rs. 6,200 |
[B] Other Charges (One Time)
Particulars | Cost |
Development Charges (DC) | Rs. 400/sq.ft. |
Parking – Covered (1 Mandatory) | Rs. 3,50,000 |
Club Membership | Rs. 1,00,000 |
IFMS | Rs. 100/sq.ft. |
Power Back-up Charges (3 KVA Mandatory) | Rs. 20,000/KVA |
Electricity Installation Charges (3 KVA Mandatory) | Rs. 20,000/KVA |
[C] Preferential Location Charges
Location | Cost/sq.ft. |
Corner | Rs. 50 |
Club Facing | Rs. 50 |
1st to 5th Floor | Rs. 100 |
[A] Payment Plan
Particulars | Amount / Percentage |
On Booking | Rs. 5,00,000 |
Within 60 days of Booking | 35% of less Booking Amount of Total Cost |
On Completion of Superstructure | 30% of BSP + 50% (Addl. Charges) |
On Offer of Possession | 35% of BSP + 50% (Addl. Charges) + 100% Other Charges |
[B] Subvention Payment Plan
Particulars | Amount / Percentage |
On Booking | Rs. 5,00,000 |
Within 60 days of Booking | 15% of Total Cost less Booking Amount |
Bank Disbursement | 80% of Total Cost |
On Offer of Possession | 5% of Total Cost |
[C] TERMS AND CONDITIONS